Surfside Bridge, Angleton, Texas


  • Surfside Bridge, Segmental Construction Engineering
  • Surfside Bridge, Segmental Construction Engineering
  • Surfside Bridge, Segmental Construction Engineering
  • Surfside Bridge, Segmental Construction Engineering
  • Surfside Bridge, Segmental Construction Engineering
  • Surfside Bridge, Segmental Construction Engineering
  • Surfside Bridge, Segmental Construction Engineering
  • Surfside Bridge, Segmental Construction Engineering
  • Surfside Bridge, Segmental Construction Engineering
  • surfside Causeway, segmental bridge construction

Project Summary


Cast-in-Place Balanced Cantilever Main Span with Precast I-Girder Approaches

Intercoastal Canal crossing with a segmental bridge structure was built utilizing cast-in-place, balanced cantilever construction. The single cell box girder with a deck width of 51 feet and was cast using form travelers. Spans lengths are 210ft, 320ft, and 210ft.

Client: H.B. Zachry Company

Services Performed


  • Construction Engineering, included casting curves, geometry control, construction load analysis, post tensioning calculations, and shop drawing production
  • Pier Table falsework was fully designed and detailed.