Trinity I-10 over Trinity River in Texas
Project Summary
Cast-in-Place Balanced Cantilever Main Span
Trinity River Crossing consists of two twin segmental bridges being built utilizing cast-in-place, balanced cantilever construction. Each bridge consists of a two cell box girder with deck widths of sixty-two feet each. It is being cast using form travelers. The navigational channel is fifty feet. Span lengths are 270ft, 450ft, and 270ft.
Williams Brothers Construction Company